Safe Handling of Compressed Gas Cylinders - WSH Bulletin

12 Jan 2010

Fact Sheet - Safe Handling of Compressed Gas Cylinders

Compressed gas cylinders are commonly used in the different industries for a variety of operations. These cylinders are heavy, normally weighing about 80 kilograms each. They are specifically designed to contain gases, such as Oxygen, Nitrogen, Argon, Helium, Carbon Dioxide and Hydrogen. These gases are compressed and stored under high pressure. The gas is released through a valve which regulates its discharge.

Compressed gas cylinders are dangerous because:



• They may contain gas that may be toxic, asphyxiating or flammable. The gas is also stored under high pressure.
• They are usually heavy and can cause injury, such as sprains and strains, if not well handled.

• If the cylinders are tipped, dropped, heated or knocked, they may rupture and explode, sending sharp metal pieces, like shrapnel, blasting through the area.

• The release of pressure from a gas leakage could generate a huge amount of force. It may also propel the cylinder, leading to injuries;

Click here for the fact sheet providing recommendations on the safe handling of compressed gas cylinders.

Wednesday, January 6, 2010

Unsafe Roof Work Resulted in Fatality - WSH Bulletin

4 Jan 2010

In recent years, a significant number of workers have been killed while working on roofs. Some of these accidents involved workers stepping on and falling through fragile roofs.

A recent accident has further contributed to this number. Unsafe unloading of glass panels on a roof caused the glass panels to topple onto two workers. One was injured while the other succumbed to his injuries. Please click HERE to read the full article.

Friday, December 18, 2009

WSH Alert – Worker Falling from Height during Lifting Process - WSH Bulletin

18 Dec 2009

A construction worker died after falling off a building under construction while erecting a formwork.

On the incident night, at around 9.40pm, the worker was stationed at the fourth level of a building under construction. An inner formwork was lifted to the same floor by a crawler crane and bolted to the floor slab. The worker then climbed onto the platform of the formwork to remove the 2 attachments for lifting the formwork. After removing them, the worker re-attached the lifting attachments onto the crane slings and the signalman gave the go-ahead for the crane to hoist the slings away.

However, one of the lifting attachments caught the rebar cage beside the formwork. The rebar cage was pulled out of its position by the crane and toppled 20m to the ground below. The worker who had earlier anchored his safety harness to the rebar cage fell together with it.


Recommendations*

For crane operators:

1. Prevent Entanglement of Load Line: Crane operators need to be alert throughout the entire lifting process. Before moving the crane’s load line, the crane operator must ensure that there is no entanglement of load line or slings with objects nearby. If the operator does not have a clear view of the lifting operations, he should adhere closely to the instructions of the signalman. In this incident, the slings (with the attachments) should have been raised sufficiently above the height of the rebar cage before slewing them over the cage.

2. Stop Slewing if movement is not smooth: The crane operator should avoid sudden movements of the load line at high speed. Start any lifting process slowly so that any abnormalities can be detected. If the operator feels abnormal resistance to the crane’s movement, he should halt the process and check (with the aid of the signalman) for possible entanglement.

For lifting crew:

3. Lifting Signalman: Lifting signalman must stay alert throughout the lifting operation, particularly during slewing of the load line. He must halt the lifting process immediately in the event of a load line entanglement.

4. Effective Communication: A system must be in place to ensure effective communication between lifting personnel, particularly between the operator and signalman. This could be done through:
• Hand signals if the signalman is in clear sight of the crane operator
• Suitable communication equipment such as walkie talkies. It is important that the operator and signalman can speak and understand a common language.

General recommendations:

5. Conduct Risk Assessment: Prior to the start of work, conduct an adequate risk assessment to identify all potential hazards and the risks involved. Appropriate control measures and safe work procedures must be established and implemented. For this case, some of the potential hazards include:

• Possible entanglement of load line with surrounding structures
• Poor visibility due to inadequate lighting
• Ineffective communications between signalman and crane operator

6. Safe Lifting Procedure: Companies should put in place procedures to mitigate the risk of load line getting entangled with the surrounding structures. These could include ensuring that:

• Lifting signalman have clear sight of the lifting process at all time
• Lifting signalman give clear instructions to crane operator
• There is sufficient lighting to ensure good visibility of the lifting process, especially if the work is carried out at night

7. Safe working at height: Companies involved in works carried out at height must implement appropriate fall protection measures for workers. When fall arrest systems are utilised, proper anchorage points or anchorage systems must be made available. In addition, if works are to be carried out at night, sufficient lighting must be provided.


Further Information

1) Factories (Operation of Cranes) Regulations

2) Singapore Standard CP 37: 2000 – Code of Practice for the Safe Use of Mobile Cranes

Thursday, December 10, 2009

Launch of WSH Manual for the Marine Industries - WSH Bulletin

9 Dec 2009

WSH Regulations require the occupier of a shipyard to implement and maintain an adequate safety and health management system to ensure the safety and health of every person in the shipyard. To help the Marine Industries, especially the small and medium sized shipyards, comply with the law and achieve good WSH standards, the WSHC (Marine Industries) Committee in collaboration with the Association of Singapore Marine Industries (ASMI), has published the WSH Manual for Marine Industries. The Manual lays out basic WSH principles, as well as provides guidance on good practices with regard to the implementation of safety management systems.

You can download the Manual from the WSHC website here.

Newly-Formed National Work at Height Safety Taskforce Releases Three-Pronged Plan to Prevent Falls At Work - WSH Bulletin

2 Dec 2009

The National Work at Height (WAH) Safety Taskforce, formed by the Ministry of Manpower (MOM) and Workplace Safety and Health (WSH) Council, has announced a three-pronged plan to improve the safety of work conducted at heights across workplaces.

The Taskforce, led by Mr Wong Weng Sun, President and CEO, Sembcorp Marine Ltd, outlined several targets, including:

• Halving current WAH fatality and injury rates by 2013 and further reduction by 2018
• Implementing Fall Protection Plans in all construction worksites and shipyards by 2012 and at all workplaces by 2015.

Together with WSH Council and MOM, the National WAH Safety Taskforce has analysed the contributing factors for past WAH incidents, and published the findings in a Safety Analysis and Recommendation Report on Work at Height. The Report highlighted seven contributing factors to WAH incidents including the lack of safe work procedures, and inadequate fall prevention or protection systems. (Click here to read the Report) To address these factors, the National WAH Safety Taskforce made three key recommendations:

Recommendation 1 - Building strong capabilities

The Taskforce recommends the implemention of Fall Protection Plans to manage WAH at a systemic level. The Taskforce and the WSH Council have introduced a new Code of Practice (CP) for Working Safely at Height (more details below) and a new WAH Kit for supervisors and workers. The Taskforce will also develop national WAH competency standards.

Recommendation 2: Promoting the benefits of WAH safety

The Taskforce will collaborate with relevant industry associations and partners to reach out to a wider audience, and promote the adoption of best practices. The Taskforce will develop a new FALLPROTECT Certification/Recognition Scheme to certify the Fall Protection Plan of companies, and recognise their commitment to safety. The WSH Council will develop a dedicated webpage to provide a one-stop resource for WAH information.

Recommendation 3: Enhancing the Intervention Framework for WAH

The Taskforce will work with various industry associations to introduce an “industry self-assessment” element. It will provide feedback to MOM on the review of existing legislation on WAH safety. MOM will also be looking at ways to extend enforcement reach to more workplaces.

Click here to read the media release and Report.

Code of Practice on Working Safely at Height

The new Code of Practice (CP) for Working Safely at Height issued by WSH Council describes a variety of fall prevention measures and devices that reduce the risk of falling from height. The CP highlights the Fall Protection Plan (FPP), which provides a systematic approach to eliminate or mitigate the risk of falling by ensuring that all reasonable fall protection measures and methods have been taken prior to the commencement of the work.

The CP for Working Safely at Height is available for download at the WSH Council’s website, HERE.

Monday, November 23, 2009

Possible Case of Electrocution - WSH Bulletin

23 Nov 09

In a recent incident, a worker was deployed to rectify a fault reported during the operation of a tower crane boom. The crane operator was in his cabin waiting for the repair work to be completed. When the cabin fan stopped unexpectedly, the operator looked out and saw the worker lying motionless on the platform in front of the control panel box.

Investigations showed that the worker was probably trying to measure or check the electrical installation inside the control panel box using multi-meter probes (an electrical measurement tool). The burnt marks and strands of hair found stuck on two of the connectors inside the control panel box suggest that he could have been electrocuted and died on the spot.


Fig. 1 Tower crane under repair

Recommendations*

1. Conduct risk assessment: Prior to the start of any work, risk assessment must be carried out by employers and workers to identify potential hazards. Appropriate actions should then be taken to eliminate the hazards or reduce the risks involved. Control measures and safe work procedures must be established, communicated and implemented to ensure the safety and health of the workers involved. Some of the hazards relevant to this incident include:

a. Exposed wires/connectors/terminals that are still energized and “live”
b. Working at height while troubleshooting the fault

2. Live testing precautions: Before performing any electrical work, one should ensure that the work can be done without the system being energised. Work on or near live conductors should be avoided. Should live testing be necessary to trace a malfunction of the equipment, suitable safety precautions should be taken, including putting temporary insulating neoprene or polythene sheets over live components and/or applying insulation to parts that are at earth potential. These temporary insulating sheets can also help to prevent the risk of accidental short circuit from tools, components and conductors.

3. Use of dry rubber insulating mat: Where there is the possibility of electrocution, workers should be asked to use dry rubber insulating mats. The rubber mat insulates the floor on which the person stands, reducing the risk of the flow of electrical current through the person. Other electrical insulation methods such as rubber blankets, gloves, sleeves, properly designed and rubber-soled boots may also be used.

4. Provision of adequate training: All workers should be adequately trained in the identification and control of hazards in their workplace. Specialized electrical safety training must be provided to those who may need to work with or around exposed components of electric circuits. The training should include, but not be limited to, basic electrical theory, proper safe work procedures, hazard awareness and identification, proper use of personal protective equipment, proper lockout/ tagout procedures, first aid including CPR, and proper rescue procedures. Provisions should also be made for periodic re-training.

5. Buddy system: For certain electrical works, it is recommended to implement a buddy system. In an emergency, the buddy (i.e. a co-worker) could switch off the electrical supply immediately and render assistance on site.

6. Lock-out procedures: Lock out procedures must be established and implemented for the inspection, repair and maintenance of any machinery or equipment. All energy sources to the relevant machinery or equipment should be isolated, disconnected or discharged to prevent any part of the machinery or equipment from being inadvertently activated or energised.

7. Personal protective equipment: Those who are potentially exposed to live components should be provided with appropriate protective clothing and equipment, such as electrical protective resistance glove for measurement and testing work. Such equipment should be inspected regularly by a competent person. Those working at height (e.g. on platform) must also be provided with a proper fall protection system, incorporating safety harness and secured anchor points to reduce the risk of falling.

Further Information

1. Workplace Safety and Health Act
2. Electricity Act (Cap. 89A)
3. Electricity (Electrical Workers) Regulations
4. Electricity (Electrical Installations) Regulations

* Please note that the information provided is intended to enhance workplace safety and health so that a similar recurrence may be prevented, and is not exhaustive. The information provided should not to be construed as implying any liability to any party nor should it be taken to encapsulate all the responsibilities and obligations of the reader of WSH Alert under the law.

Tuesday, November 17, 2009

Fatigue Attributed to the Death of a Prime Mover Driver - WSH Bulletin

16 Nov 2009

Incident

In this incident, a Terminal Prime Mover (TPM-2) in a container port swerved and collided onto the rear of another TPM (TPM-1) travelling in the opposite direction (Figure 1). As a result of the collision, the driver of TPM-2 was thrown out of the cabin and subsequently died in hospital.

Summary of Findings

Investigation revealed that the incident occurred primarily due to Man (driver of TPM-2), with Management as a contributory factor. The driver did not take care of his own safety and health by adhering to the “Compulsory Short Break” (CSB) as required by the Management. He also did not fasten his seat belt, and the fatigue arising from long hours of work might have caused him to lose control of his TPM, and prevent him from applying the emergency brake in time.

Management contributed to the incident by not having a well designed work schedule for the drivers. Although Management instituted a good concept in CSB, it was inadequate for the drivers to recuperate sufficiently.

For more details and information, click Here for the Lessons Learnt Case Report which describes the incident details, and highlights recommendations to prevent similar accidents from happening.

Thursday, November 12, 2009

WSH Alert – Fall from Height - WSH Bulletin

11 Nov 09

Incident

In a recent accident, a worker fell to his death while climbing the turntable ladder to the crane cabin of a tower crane. The lifeline was terminated at the top mast, and the worker had removed his safety harness when climbing from the turntable to the cabin. While he was ascending the turntable ladder, the worker slipped and fell onto the mast platform 6 m below.

Fig 1: Height of worker’s fall

Fig 2. The turntable ladder to the cabin

Recommendations*

1. Conduct risk assessment before starting any work: Identify potential hazards and take appropriate actions to eliminate the hazards or reduce the risks involved. For this incident, the hazards include the failure to don proper Personal Protection Equipment (PPE). The risk assessment should also include non-routine or emergency situations so that measures can be adopted to minimise the risks for such situations.

2. Put in place an effective workplace safety and health management programme: Employers should establish and implement a Safety and Health policy, and safety management system with proper control measures and safe work procedures. This includes a fall protection plan for any work that may involve workers falling from a height. The safety and health programme must be clearly communicated to all levels of personnel, such as through refresher courses or daily tool box meetings.

3. Safe access on tower cranes: To prevent falls, employers must provide safe access for crane operators and other persons who need to carry out inspection and maintenance work on a tower crane. Safe access (ladders with hoop guards) to the operator’s cabin should include rest-landings at every interval not exceeding nine metres of the mast. If a mast has a continuous vertical ladder for access, an effective fall-arrest system that does not require the person to constantly hook on and off must be provided.

4. Issue appropriate PPE: Workers must be issued the appropriate PPE, such as full body harness that is securely anchored (through lanyard, shock absorbers and hook) at all times to protect against accidental falls. Additional lifeline should be employed specifically for the turntable to prevent falls. The workers must be trained on the safe and proper use of the PPE.

5. Ensure proper supervision: Employers should ensure that workers adhere to the established safe work procedures, e.g. by ensuring that workers follow the fall protection plan when working at height and disciplining workers who exhibit unsafe acts and do not comply with the safe work procedures.

Further Information

1. Workplace Safety and Health Act, please click here.

2. Factories (Operation of Cranes) Regulations.

3. Workplace Safety and Health (Construction) Regulations, please click here.

4. Singapore Standard CP 62 – Safe Use of Tower Cranes.

5. Singapore Standard SS 528 – 1: 2006 Personal Fall Arrest Systems - Full-body harnesses.

6. Singapore Standard SS 528 – 2: 2006 Personal Fall Arrest Systems - Lanyards and energy absorbers.

7. Singapore Standard SS 528 – 3: 2006 Personal Fall Arrest Systems - Self-retracting lifelines.

8. Singapore Standard SS 528 – 5: 2006 Personal Fall Arrest Systems - Connectors with self-closing and self-locking gates.

9. ProBE Technical Advisory on Working At Height, please click here.

* Please note that the information provided is intended to enhance workplace safety and health so that a similar recurrence may be prevented, and is not exhaustive. The information provided should not to be construed as implying any liability to any party nor should it be taken to encapsulate all the responsibilities and obligations of the reader of WSH Alert under the law.

Tuesday, November 10, 2009

Difference between working in different industries

After working as a Safety Officer for 3 years at 3 different industries, I would like to share on my personal views on the pros & cons of these 3 workplace. Shipyard, Metalworking & Electronic industries.

Shipyard

Pros:
You will get strong support from your top management in getting safety requirement (getting RA written, getting people to be responsible for first aid, essential safety training) implemented/conducted as required by the legislation. Cooperation from subcontractor can be positive. Mainly on enforcement & inspection.

Cons:
Be prepared to be working everyday & working at the highest risk working environment. Sun, rain, sweat, dirt, pollutant, they are your best friend. You'll need good physical stamina. Chances of having a critical accident is high.

Metalworking

Pros:
You might get good support from top management due to OHSAS 18001 &/or moderate accident rate. You might face some glitches when getting employee to do safety requirement. The level of difficulty shall depends on the level of support you received from your top management. Chances of having personal time & 5 Days job schedule is high.

Cons:
Dust, coolant, high level of first aid cases. Majority from Hand Injury. Plenty of audits to handle. More of paperwork stress. Chances of having a critical accident is moderate.

Electronics

Pros:
You might not have a single severe accident even if you have worked there for 5 years! Very low risk & clean working environment. Mainly 5 days schedule.

Cons:
You will not get sufficient support from top management as Safety is an oblivion issue to them due to extreme low accident rate. In an electronic company, production is top priority to the whole company. So getting employee to participate in Safety requirement is near to but not impossible. Employees will tell you they are very very busy & they have no time for Safety meeting & attend training. You may be sitting in the training room for the whole day with no participant. Even if you report to your top management, little will be done. You will get the feeling of unable to discharge your reasonably responsibility as a Safety Officer.

Currently, I'm facing extreme negative Safety attitude in my current company. I guess this is expected in a Manufacturing Company. I will aim to explore into new industry to gain more understanding on the Best Safety Working Industry to work in ..... but not so soon...

Thursday, November 5, 2009

Dust Control at Demolition Sites - WSH Bulletin

4 Nov 2009

Demolition work involves hacking, crushing, and cutting, which can generate large amount of dust and debris. If poorly managed, the clouds of dust can contain particulate emissions that may be hazardous to human health. They may also reduce visibility, delay demolition activities and cause property damage.

To help contractors better control these hazards, we have provided important learning points in this WSH Bulletin, including enclosure of work areas, proper ventilation systems, workers’ training and the provision of Personal Protective Equipment. A good practice example is also included. Ginlee Construction Pte Ltd, a bizSAFE3 contractor, explains how it planned the demolition works at Changi Airport Terminal 1 while the terminal continued to be in operation. Read the full article here.